Fidic Yellow Book Pdf 2017 【2024-2026】

An Overview of the FIDIC Yellow Book 2017 Edition

In the 2017 Yellow Book, the Engineer (appointed by the Employer) is no longer just a certifier. The Engineer now has a duty to act neutrally (Sub-Clause 3.7). The PDF outlines a new "Engineer’s Determination" process—a non-binding opinion intended to resolve disputes before they escalate to a Dispute Avoidance/Adjudication Board (DAAB).

Particular Conditions:

Specific project data and amendments tailored to the local law or unique project needs. fidic yellow book pdf 2017

  • Contractor’s all-risks (for works and plant)
  • Third-party liability
  • Employer’s liability (if applicable)
  • Loss of or damage to Contractor’s equipment
  • Design liability insurance may be required for design-build projects.

Insurance Requirements