Q: When is the construction of the VAMC expected to begin? A: Construction work is scheduled to begin in 2025-26.
: 14 lanes in total, including space for a Metro line , dedicated bus lanes, and separate lanes for motorized and non-motorized traffic. virar-alibaug multimodal corridor route map
The route passes through several critical areas including Bhiwandi, Kalyan, Dombivli, Panvel, Taloja, and Uran . Kashimira – Border of Mira-Bhayandar
The is a proposed high-capacity access-controlled expressway in Maharashtra, India. It is designed to decongest the Mumbai–Pune Expressway and the old Mumbai–Goa Highway (NH-66) by connecting the western and eastern coasts of the Mumbai Metropolitan Region (MMR). including space for a Metro line